Infrastructure

 

STATUS OF INFRASTRUCTURE IN JNV’S 

I

Area of land  allotted (in acres)

 

Whether land transferred in the Name of Samiti

 

Vidyalaya shifted to permanent buildings on

: 45 Acres

 

:Yes

 

 

:Yes

ii

Status of Boundary Wall

 

a.  Brick Wall

b.  Barbed wire fencing

: (Completed)

 

 a. Brick Wall

iii

Permanent buildings constructed

: (CPWD pattern)

iv

School building

: Complete

v

Dormitories

:  Boys 08 Nos.

   with Warden Residence 04 Nos.

 

 

:  Girls 04 Nos.

   with Warden Residence 04 Nos.

vi

Kitchen/dining Hall

 

No. of shifts required for all students  to take food

:  Complete, Area 15000 Sft.

 

02 shifts

vii

Principal Residence

 

01 No.

viii

Staff Quarters

 

 

: Type III = 28 Nos.

  Type II  = 01 Nos.

  Type  I   = 12 Nos.

  Principal Qtr = 01 No.

  SP Sheds converted into Staff Qrs.:00Nos.

ix

M.P. Hall

: Available

x

Workshop

: Available

xi

Type of O.H. Tank

 

Its capacity

 

Present Status

: Shaft type based

 

:  100000 litres

 

: Working.

xii

U.G. tank

 

Its capacity

 

Present Status

Yes

100000 Litres

 

: Working.

xiii

D.G. Set

 

 

 

 

:  Available

: Kirloskar make

:   10 KVA

: Working

: Year of procurement March-1995.

xiv

Sewage Pump 

: 05 H.P.

xv

Water Pump 

:05 H.P. capacity

xvi

Electrification

 

Electric connection

Sub Station building

Street lighting

 

Numbers of hrs. during day when power supply is available on an average. 

 

 :   Urban Feeder

:  Complete

: 40 Nos. of Poles

 

: 12 hrs.

 

xvii

Playfields

 

400 metre track

40 x 30 metre basket ball court

40 x 30 metre volley ball court

 

 

: Available

01 Nos.   – Available

01 Nos.   – Available

 

xviii

Water supply

Tube Well

Hand pump

Connection from PHED

 

: Potable,  02 Nos.-  working

: Potable, 00 Nos.- 

Nil hours supply in a day

xix

Rajiv Gandhi Smriti Van

:  Available

xx

Fire fighting arrangement

:  Working

xxi

Last date of cleaning of

(a)   Septic tank

(b)   Water tanks

 

: 15.09.2008

: 16.09.2008

xxii

Whether area around transformer is fenced

:  Yes

xxiii

Whether open wells, if any, are covered from top

:   Yes

xxiv

Works taken up under M&R fund during current year and last year:-

: Yes